Example price for the complete project

As with individual repair the house, lodge, villa, etc. in the repair of public buildings or offices on the first meeting customer is interested in the project: – How, to what extent, at what stage and for what?

Could it be the initial step to calculate the notional amount of construction and furnishings required for this project and what will be the model uncertainty in the amount?

of the work performed. These questions always remain open at the beginning of each project. Who to turn to a private person or studio? Does this will affect the quality of the repair work?

Here are the answers to these questions:

At first you have to understand that the value of any repair work depends on three factors:

- The initial state of your project, the material and the installation repairs. The work of the old rural house with overlaps may not be comparable in price with finishing work in a new building or structure. The cost of repair of such an object varies from 150 Levs per sq.m. depending on the complexity of the work performed and the maximum sample number can reach up to 1,000 lev per sq.m. At the same time any major construction organization or an individual is required to provide a detailed account, which will not in all points tallied materials list works executed, and there are specific works as a template, how is it possible to reconcile the ideas and the promotion of project in interagency committees.

- It should be determined separately account of any kind of work with mandatory reporting of all costs and finishing, decoration and other materials.

If these are civil and erection works, the application must take into account all spent materials, the cost of steel structures, building materials, glue, putty, primer, etc.

In sanitary engineering works due account of the full cost of labor for installation, piping, fittings, valves, fittings and insulation devices to record vodam hot and cold glue and much more. Frequent calculating these parts can exceed several times the value of the tubes themselves, but their installation is impossible without all constituent elements. Many small elements lead to big bills that customers often difficult to comprehend.

- The detailed accounts should be made also in electrical work. Price of cable, type of cable and switches, insulation, even in advance can be taken into account only the materials themselves without work on the project of a competent expert.

These are just three of the main factors determining the cost of a project, of course there are many others who should not be underestimated – decorations, flooring, paint and more.

How much can be inaccurate initial expense after starting work, you ask?

If the calculations are made ​​only on a calculator without being fully completed project design itself, do not be surprised if the repairs and their scores exceed 20-40% of the original price. In determining the expected costs of the completed design – design differences can not be more than 10% contingency. Also can be made ​​several different rates, by replacement of various materials with cheaper or more expensive ones, reducing some of the activities at the expense of quality (often customers think without any stage repair , everything will work out) in order to save investment. Supply of all materials, are also a significant part of the investment – all materials to work on a project to be delivered, uploaded or downloaded to the workstation location, activity which is quite time-consuming and laborious. The average cost of supply per square meter ranges from 5 to 100 BGN and everything of course is individual for each project.

If you need to install air conditioning and ventilation to the interior, this is quite a separate component, and it comes in a different account to estimate the cost – materials, equipment and installation, as this section may be significantly different in terms of costs to be determined the specifics of the premises. For example, we can give ventilation for bar or office with customer service, it is quite different from residential investment apartment where two people are planning to live.

Is there a difference between the cost of repairs and project a professional organization and individuals? Of course, the answer is “YES”!

Firstly, the design studio or developer if no narrow specialists in a task, she hires professionals or people capable of dealing with the problem, it is mainly responsible for the guarantees and quality of materials and the whole thing. This is documented by signing the contract. When the client is implementing the project with individual employees, it is good to check the available certificates to employees to check the quality of the materials purchased from the store as claims and guarantees the quality of the work can not be required . As always, the final decision always remains on the client.

Always in every sector of the construction can be found a company that will suit you more quality performance and medium or low prices for their services. Anyway, after the cost estimates for the entire repair your home, office or the project itself are large it is almost impossible to reduce the cost of the workload at the expense of some activities.

We also want to achieve the best results and the best with the least possible investment, right?